Special Announcement: The District will de-water the entire system for critical maintenance
Notices
October 16, 2025

The District will de-water the entire system for critical maintenance starting November 24, 2025 and recharging the lines beginning February 1, 2026. No water will be delivered between those dates.

All allocated water must be used by February 28, 2026

Conjunctive Use District: By design and contract with the federal government, the District is a conjunctive use district, meaning landowners need to use surface supply in conjunction with available groundwater to avoid overdraft of the groundwater basin.

To comply with the conjunctive use designation, the District Rules and Regulations require growers to use their allocated surface supply. Allocated surface water left unused by landowners on February 28, 2026, will still be billed to the landowner.

Unused allocation (billed to landowners) and water placed in the District Pool (by August 31, 2025), will be carried over and allocated to all landowners in the subsequent year along with water allocated to the District by the federal project.

If you have questions, contact the District at 559-562-2534