As the irrigation season ends, maintenance activities step into high gear. Lindmore Irrigation District has a rigorous schedule in place to maintain, replace, rebuild, and fix the most pressing issues on the system so Lindmore can ensure smooth water deliveries during the next irrigation season.
Lindmore achieves a high volume of maintenance activities with its highly skilled, professional staff.
2025-2026 Winter Maintenance Needs | |
Feet of Pipe to Replace | 4081 |
Vales Repair/Replace | 52 |
Meters Repair / Replace | 18 |
Air Vents Repair | 6 |
Pump Maintenance / Repair | 15+ |
Moss Pits Maintenance | 4 |
The images below show the pump wiring and lift tube that belongs to one of the lift stations on our 5th Avenue line. Because of a decline in downstream volume, staff added 5th Avenue to the winter maintenance schedule. Delivering water is a corrosive activity requiring routine maintenance, as seen by the wiring on this pump and the severe degradation of the lift tube.
Daniel Herrera, left, is shown fabricating connections for the new irrigation pipe being installed this winter.
Successfully executing the maintenance of our more than 70-year-old system and making improvements to meet current demands is an all-hand-on-deck activity. From the guys in the field, to the office staff, management, and the Board of Directors, all Lindmore Irrigation District staff are committed to the goal of providing the most reliable and efficient irrigation system