Maintenance and Operations Activity Report: July 2025
News
September 8, 2025

Lindmore Irrigation District staff completed several maintenance and operations activities during July, as shown on the table below. Meter replacement, meter installation, and valve replacements were all tasks among the maintenance activities.

Date Activity
2025.07.09 Meter replacement
2025.07.09 Meter Install
2025.07.10 Replace air valve
2025.07.10 Replace valve
2025.07.10 Repaired pipe leak
2025.07.10 Meter replacement
2025.07.14 Repaired pipe leak
2025.07.16 Motor chain replacement
2025.07.23 Meter replacement
2025.07.28 Meter tube replacement
2025.07.28 Weld failed – repaired
2025.07.30 Meter replacement

Damien Robles-Ayala and Daniel Herrera replaced a vertical flow meter that had rusted through. This technique is known in Lindmore as a punch through and uses an inline mag meter. Staff’s ability to complete the fabrication and installation in-house has greatly reduced the time to completion, resulting in a high efficiency meter and a safer work environment.

Lindmore’s operations and maintenance crew work hard to increase efficiency to ensure water operations are running smoothly.

Pictured: Team Lead Robert works with Damien and Daniel to excavate and repair leak with metal band.